Project Profile: Pune, MaharashtraSafety & Compliance
Mayflower Residency CHS - Case Study
Property:Mayflower Residency CHS
Equipment:6 Passenger Elevators (12 Floors)
Scope:Free 25-Point Safety Audit, ARD Rectification, Brake Relining & Balancing
Location:Pune, Maharashtra
Engineering Operations & Track Record350+ Elevators Under Care • 15+ Certified Engineers • 15+ Years Experience
Project Challenge
Following an unannounced state lift inspection, the society received an official compliance notice citing defective Automatic Rescue Devices (ARD) and unverified governor rope tensioning, facing imminent suspension of elevator power.
The NSE Engineering Solution
NSE conducted a comprehensive 25-point safety audit within 24 hours, replaced exhausted battery banks with high-capacity dry cell ARD packs, recalibrated overspeed governor safety gears, and executed precision full-load drop tests.
“NSE saved our committee from repeated lift shutdowns by rectifying our ARD systems and restoring complete reliability in just two weeks.”
Deepak Shirodkar•Hon. Secretary, Mayflower Residency CHS
Measurable Results Achieved
14 DaysNotice Clearance
100% TestedARD Success Rate
100% Pass RateARD Reliability