Project Profile: Airoli, Navi MumbaiCost Savings
Greenfield Heights CHS - Case Study
Property:Greenfield Heights CHS
Equipment:8 High-Rise Passenger Elevators (16 Floors)
Scope:Multi-Brand AMC Takeover, Preventative Overhaul, Genuine Spares Protocol
Location:Airoli, Navi Mumbai
Engineering Operations & Track Record350+ Elevators Under Care • 15+ Certified Engineers • 15+ Years Experience
Project Challenge
The 8-wing housing society was paying excessive fees to a legacy OEM contractor who repeatedly delayed critical door drive replacements. This caused frequent shutdowns and heated resident disputes during morning office commute hours.
The NSE Engineering Solution
NSE assumed comprehensive maintenance across the 8-car fleet, replaced worn landing interlocks with genuine OEM spares, established an on-site emergency spare parts locker, and instituted monthly 25-point preventative servicing.
“Switching to NSE cut our society elevator expenditure by nearly a third while our lifts finally run without daily morning breakdowns.”
Ramesh Thorat•Chairman, Greenfield Heights CHS
Measurable Results Achieved
31% vs OEMCost Savings
92%Breakdown Reduction
99.8%Fleet Uptime